Property
Beds
5
Full Baths
4
1/2 Baths
1
Year Built
2008
Sq.Footage
4,641
Here is your chance to own a gorgeous, French styled, 7 yr. old custom built brick home on .58 acres in desirable Bon Hills subdivision – Ladue schools, convenient Olivette location. This well-appointed home was featured in St. Louis AT HOME magazine Architects & Interior Design Awards - 1st Place Home Office 2010. The home features 5 large bedrms, 4 ½ baths & hardwood floors throughout the main level. There is a fabulous stone fireplace surrounded by built-ins in the living rm that opens to a chef’s dream kitchen with butler’s bar & walk-in pantry. The home has a 3 car garage, an open floor plan, a large laundry/mud room & a finished lower level (a great “man cave”) that also houses the 5th bedroom. The upper level master suite has a beautiful wash room with an oversized double shower, a Jacuzzi soaking tub & 2 full walk in closets. 3 sets of beautiful French doors in the living rm look out on a large, level, landscaped lot ready for any of your outdoor living space dreams or desires.
Features & Amenities
Interior
-
Other Interior Features
Bookcases, Open Floorplan, Walk-In Closet(s), High Speed Internet, Breakfast Bar, Kitchen Island, Eat-in Kitchen, Double Vanity, Pantry
-
Total Bedrooms
5
-
Bathrooms
4
-
1/2 Bathrooms
1
-
Above Grade Finished Area
3491.0
-
Basement YN
YES
-
Cooling YN
YES
-
Cooling
Ceiling Fan(s), Central Air, Electric
-
Fireplace YN
YES
-
Heating YN
YES
-
Heating
Forced Air, Zoned, Natural Gas
-
Pet friendly
N/A
Exterior
-
Garage
Yes
-
Garage spaces
3
-
Construction Materials
Brick, Other
-
Parking
Attached, Garage, Garage Door Opener, Oversized, Off Street
-
Patio and Porch Features
Patio
-
Pool
No
-
Waterfront YN
NO
Area & Lot
-
Lot Features
Level, Sprinklers In Front, Sprinklers In Rear
-
Lot Size(acres)
0.58
-
Lot Size(square feet)
25265.0
-
Property Type
Residential
-
Property Sub Type
Single Family Residence
-
Architectural Style
Other, French Provincial
Price
-
Sales Price
$935,000
-
Tax Amount
$10,615
-
Sq. Footage
4, 641
-
Price/SqFt
$201
HOA
-
Association
YES
-
Association Fee
$250
-
Association Fee Frequency
Annually
-
Association Fee Includes
N/A
School District
-
Elementary School
Old Bonhomme Elem.
-
Middle School
Ladue Middle
-
High School
Ladue Horton Watkins High
Property Features
-
Accessibility Features
Grip-Accessible Features
-
Ownership
Private
-
Sewer
Public Sewer
-
Water Source
Public
Schedule a Showing
Showing scheduled successfully.
Mortgage calculator
Estimate your monthly mortgage payment, including the principal and interest, property taxes, and HOA. Adjust the values to generate a more accurate rate.
Your payment
Principal and Interest:
$
Property taxes:
$
HOA fees:
$
Total loan payment:
$
Total interest amount:
$
Location
County
St. Louis
Elementary School
Old Bonhomme Elem.
Middle School
Ladue Middle
High School
Ladue Horton Watkins High
Listing Courtesy of Michelle Hoberman , Coldwell Banker Gundaker-T & C
RealHub Information is provided exclusively for consumers' personal, non-commercial use, and it may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing. All information deemed reliable but not guaranteed and should be independently verified. All properties are subject to prior sale, change or withdrawal. RealHub website owner shall not be responsible for any typographical errors, misinformation, misprints and shall be held totally harmless.
AGENT
Julie Downing
Call Julie today to schedule a private showing.
* Listings on this website come from the FMLS IDX Compilation and may be held by brokerage firms other than the owner of this website. The listing brokerage is identified in any listing details. Information is deemed reliable but is not guaranteed. If you believe any FMLS listing contains material that infringes your copyrighted work please click here to review our DMCA policy and learn how to submit a takedown request.© 2024 FMLS.